Patrick Henry 02
The project consisted of erosion control installation, concrete and asphalt demolition, site rough grade and fine grading, import/export of materials, wall footing excavation, onsite flatwork around the building and parking lot, and a new loading dock.
Project Details
Devcon Construction Inc.
Santa Clara, CA
1.5 Acres